STREET PROJECTS OLD RIVER SCHOOL ROAD PAVEMENT REHABILITATION PROJECT IMPERIAL HWY. TO ARNETT ST.
PROJECT INCLUDES THE REHABILITATION OF EXISTING ASPHALT CONCRETE ROADWAY; REPAIR AND REPLACEMENT OF DAMAGED CURB AND GUTTER,SIDE WALK AND INSTALLATION OF NEW CURB RAMPS; REPAIR OF POTABLE WATER INFRASTRUCTURE AND REPLACEMENT OF STRIPING WITH BIKE LANES.
$1,800,000.00 JULY 2018 TO NOVEMBER 2018

Open Location Map
STREET PROJECTS LAKEWOOD BLVD. IMPROVEMENTS PHASE 3C GALLATIN RD. TO TELEGRAPH RD.
PROJECT INCLUDES CONTINUATION OF IMPROVEMENTS. COORDINATION WITH CALTRANS FOR PURPOSE OF OBTAINING AN ENCROACHMENT PERMIT AND WITH AFFECTED UTILITY COMPANIES PREVIOUSLY CONSTRUCTED ALONG LAKEWOOD BLVD, TO THE SOUTH, STREET WIDENING, MEDIAN AND PARKWAY IMPROVEMENTS, INCLUDING REPLACEMENT OF LANDSCAPING WITH DROUGHT-TOLERANT PLANT MATERIAL AND RECYCLED WATER IRRIGATION, ORNAMENTAL PEDESTRIAN AND STREET LIGHTING, PAVEMENT REHABILITATION, EXTENSION OF RECYCLED WATER LINE AND MISCELLANEOUS CONCRETE IMPROVEMENTS, TRAFFIC SIGNAL, SIGNAGE AND STRIPING MODIFICATIONS AND REPLACEMENT AND "GREEN STREET" ENHANCEMENTS TO FACILITATE STORMWATER INFILTRATION AND GROUNDWATER REPLENISHMENT.
$5,000,000.00 MAY 2018 TO OCTOBER 2018

Open Location Map
STREET PROJECTS FLORENCE AVENUE BRIDGE REPLACEMENT AT SAN GABRIEL RIVER FLORENCE AVENUE BRIDGE OVER THE SAN GABRIEL RIVER
THE PROJECT CONSISTS OF THE REPLACEMENT OF THE FLORENCE AVENUE BRIDGE OVER THE SAN GABRIEL RIVER WITH A WIDER SIX-LANE BRIDGE.
$218,000.00 FEBRUARY 2019 TO AUGUST 2020

Open Location Map
STREET PROJECTS FLORENCE AVENUE BRIDGE REHABILITATON AT RIO HONDO RIVER FLORENCE AVENUE BRIDGE OVER THE RIO HONDO RIVER
THE PROJECT CONSISTS OF THE REHABILITATION OF THE FLORENCE AVENUE BRIDGE OVER THE RIO HONDO RIVER.
$2,200,000.00 JULY 2018 TO APRIL 2019

Open Location Map
STREET PROJECTS LAKEWOOD BLVD. AT FIRESTONE BLVD. INTERSECTION IMPROVEMENTS LAKEWOOD BLVD. AT FIRESTONE BLVD. INTERSECTION
PROJECT INCLUDES IMPROVEMENTS AT THE INTERSECTION OF LAKEWOOD BOULEVARD AND FIRESTONE BOULEVARD INCLUDING DOUBLE LEFT-TURN LANES IN THE NORTHBOUND AND SOUTHBOUND DIRECTIONS, CONSTRUCTION OF THE INTERSECTION AS A CONCRETE INTERSECTION WITH DECORATIVE CROSSWALKS AND MODIFICIATION OF THE EXISTING TRAFFIC SIGNAL.
$1,800,000.00 JULY 2018 TO DECEMBER 2018

Open Location Map
STREET PROJECTS PAVEMENT REHABILITATION AT VARIOUS LOCATIONS THIRD STREET - OLD RIVER SCHOOL ROAD TO CIVIC CENTER DRIVE, CIVIC CENTER DRIVE - BROOKSHIRE TO THIRD...
THE PROJECT CONSISTS OF THE REHABILITATION OF THE EXISTING ASPHALT CONCRETE ROADWAY; REPAIR AND REPLACEMENT OF DAMAGED CURB AND GUTTER AND SIDE WALK, THE INSTALLATION OF NEW CURB RAMPS AND POTABLE WATER IMPROVEMENTS.
$1,750,000.00 JULY 2018 TO JUNE 2019

Open Location Map
STREET PROJECTS WOODRUFF AVENUE PAVEMENT REHABILITATION IMPERIAL HIGHWAY TO STEWART AND GRAY ROAD
THE PROJECT CONSISTS OF THE REHABILITATION OF THE EXISTING ASPHALT CONCRETE ROADWAY; REPAIR AND REPLACEMENT OF DAMAGED CURB AND GUTTER AND SIDE WALK, THE INSTALLATION OF NEW CURB RAMPS AND POTABLE WATER IMPROVEMENTS.
$1,130,000.00 JULY 2018 TO JUNE 2019

Open Location Map
STREET PROJECTS SUVA STREET BRIDGE REHABILITATION AT THE RIO HONDO RIVER SUVA STREET BRIDGE OVER THE RIO HONDO RIVER
THE PROJECT CONSISTS OF THE REHABILITAION OF THE SUVA STREET BRIDGE OVER THE RIO HONDO RIVER. (LOS ANGELES COUNTY PROJECT)
$35,000.00 JULY 2018 TO MARCH 2019

Open Location Map
STREET PROJECTS BELLFLOWER BOULEVARD PAVEMENT REHABILITATION BELLFLOWER BOULEVARD, FROM IMPERIAL HIGHWAY TO STEWART AND GRAY ROAD
REHABILITATION OF EXISTING PAVEMENT; MISCELLANEOUS REPAIR OF EXISTING CONCRETE SURFACES; AND INCIDENTAL REPLACEMENT OF STRIPING AND PAVEMENT MARKINGS.
$120,000.00 JULY 2018 TO JUNE 2019

Open Location Map
STREET PROJECTS I-5 FREEWAY (SEGMENT 5) WIDENING PROJECT I-5 FREEWAY FROM NORWALK CITY LIMIT TO FLORENCE AVENUE
THE FINAL PHASE OF THE I-5 FREEWAY WIDENING PROJECT BETWEEN THE SR 91 AND THE I-605 FREEWAYS, OTHERWISE KNOWN AS SEGMENT 5, WHICH INCLUDES THE PORTION OF THE FREEWAY BETWEEN THE NORWALK CITY BOUNDARY AND FLORENCE AVE. BUT THE WORK WILL ACTUALLY EXTEND NORTH OF THE I-605 FREEWAY IN ORDER TO PROPERLY TRANSITION WITH THE EXISTING TRAVEL LANES. THE PROJECT INVOLVES THE WIDENING OF THE I-5 FREEWAY FROM 8 TO 10 LANES AND THE REPLACEMENT OF THE FLORENCE AVE. OVERCROSSING WITH A NEW BRIDGE. IN ADDITION, FLORENCE AVE. WILL BE RECONSTRUCTED BETWEEN STUDEBAKER RD. AND ORR AND DAY RD. THE OVERALL PROJECT DURATION IS APPROX. 30 MONTHS. PLEASE BE ADVISED THAT FLORENCE AVE. WILL REMAIN DOWN TO 1 TO 2 LANES PER DIRECTION FOR APPROX. 24 MONTHS. MOTORISTS ARE ENCOURAGED TO SEEK ALTERNATE ROUTES. CALTRANS HAS DESIGNATED FIRESTONE BLVD. AS THE EASTBOUND DETOUR ROUTE AND TELEGRAPH RD. AND SLAUSON AVE. AS THE WESTBOUND DETOUR ROUTES. PLEASE CALL THE I-5 PROJECT HOTLINE AT (855) 454-6335 FOR MORE INFO.
$20,000.00 MARCH 2017 TO FEBRUARY 2020

Open Location Map
STREET PROJECTS TELEGRAPH RD. TRAFFIC THROUGHPUT AND SAFETY ENHANCEMENTS WEST CITY LIMIT TO LAKEWOOD BLVD. & PASSONS BLVD. TO EAST CITY LIMIT
PROJECT INCLUDES INSTALLATION OF RAISED MEDIAN ISLANDS WITH DROUGHT-TOLERANT LANDSCAPING AND IRRIGATION; PAVEMENT REHABILITATION; MISCELLANEOUS CONCRETE REPAIRS; ADJUSTMENTS OF UTILITY AND SURVEY COVERS TO GRADE; POTABLE WATER IMPROVEMENTS; AND REPLACEMENT OF STRIPING AND PAVEMENT MARKINGS
$733,500.00 JUNE 2018 TO DECEMBER 2018

STREET PROJECTS FY 17/18 ANNUAL MISCELLANEOUS CONCRETE CONSTRUCTION AND REPAIR PROJECT, COUNCIL DISTRICTS 1 & 3 COUNCIL DISTRICT 1
PROJECT CONSISTS OF MISCELLANEOUS CONCRETE CONSTRUCTION AND REPAIRS FOR PROJECT AREA. PROJECT INCLUDES REMOVAL AND RECONSTRUCTION OF PCC CURB, GUTTER, SIDEWALK, DRIVEWAYS, AND CURB RAMPS; CONSTRUCTION OF PCC SIDEWALK; REMOVAL AND RECONSTRUCTION OF AC PAVEOUTS; CLEARING, GRADING, EXCAVATION, AND TREE ROOT REMOVALS; BACKFILLING, RE-GRADING, RESTORATION OF PARKWAYS AND AREAS DISTURBED BY THE CONSTRUCTION; RESEEDING AND/OR PLANTING SOD TURF
$300,000.00 MAY 2018 TO AUGUST 2018

STREET PROJECTS FY 17/18 RESIDENTIAL STREET RESURFACING CITYWIDE
PROJECT CONSISTS OF THE PAVEMENT REHABILITATION OF THE EXISTING RESIDENTIAL STREETS CITYWIDE. PROJECT INCLUDES INSTALLATION OF ASPAHLT CONCRETE PAVEMENT OVERLAY; REPAIR AND REPLACEMENT OF DAMAGED CURB, GUTTER, SIDEWALK; INSTALLATION OF NEW CURB RAMPS; REPLACEMENT OF TRAFFIC STRIPING, PAVEMENT MARKINGS, AND RAISED PAVEMENT MARKERS.
$1,850,000.00 MAY 2018 TO AUGUST 2018

STREET PROJECTS FY 17/18 SLURRY SEAL PROJECT (COUNCIL DISTRICT 2) COUNCIL DISTRICT 2
PROJECT INCLUDES SEALING CRACKS IN THE ASPHALT PAVEMENT, APPLYING A TYPE II SLURRY SEAL COAT TO THE PAVEMENT SURFACE, REPLACEMENT OF TRAFFIC STRIPING, PAVEMENT MARKINGS, AND RAISED PAVEMENT MARKERS.
$250,000.00 MAY 2018 TO JULY 2018

Open Location Map
STREET PROJECTS TWEEDY LANE PAVEMENT REHABILITATION FLORENCE AVENUE TO SUVA STREET
PROJECT INCLUDES THE REHABILITATION OF EXISTING ASPHALT CONCRETE ROADWAY; REPAIR AND REPLACEMENT OF DAMAGED CURB AND GUTTER, SIDEWALK; INSTALLATION OF NEW CURB RAMPS; REPLACEMENT OF TRAFFIC STRIPING, PAVEMENT MARKINGS, AND RAISED PAVEMENT MARKERS.
$375,000.00 JUNE 2018 TO SEPTEMBER 2018

Open Location Map
TRAFFIC PROJECTS PARAMOUNT BOULEVARD MEDIAN ISLAND PROJECT IMPERIAL HIGHWAY TO FLORENCE AVENUE
PROJECT INCLUDES THE CONSTRUCTION OF MEDIAN ISLANDS ON PARAMOUNT BOULEVARD BETWEEN IMPERIAL HIGHWAY AND FLORENCE AVENUE WITH DROUGHT-TOLERANT LANDSCAPING AND NEW IRRIGATION AND PAVEMENT REHABILITATION BETWEEN FLORENCE AVENUE AND 7TH STREET.
$182,600.00 JUNE 2018 TO NOVEMBER 2018

Open Location Map
TRAFFIC PROJECTS FLORENCE AVENUE AT OLD RIVER SCHOOL ROAD TRAFFIC SIGNAL UPGRADE INTERSECTION OF FLORENCE AVENUE AND OLD RIVER SCHOOL ROAD
THE PROJECT CONSISTS OF THE UPGRADE OF THE TRAFFIC SIGNAL AT THE INTERSECTION OF FLORENCE AVENUE AND OLD RIVER SCHOOL ROAD AND REPLACEMENT OF CURB RAMPS.
$248,000.00 SEPTEMBER 2016 TO MARCH 2018

Open Location Map
TRAFFIC PROJECTS BELLFLOWER BOULEVARD AT FOSTER ROAD TRAFFIC SIGNAL UPGRADE INTERSECTION OF BELLFLOWER BOULEVARD AND FOSTER ROAD
PROJECT INCLUDES THE UPGRADE OF THE TRAFFIC SIGNAL AT THE INTERSECTION OF BELLFLOWER BOULEVARD AND FOSTER ROAD
$241,000.00 SEPTEMBER 2016 TO MARCH 2018

Open Location Map
TRAFFIC PROJECTS WOODRUFF AVENUE AT FOSTER ROAD TRAFFIC SIGNAL UPGRADE INTERSECTION OF WOODRUFF AVENUE AND FOSTER ROAD
PROJECT INCLUDES THE UPGRADE OF THE TRAFFIC SIGNAL AT THE INTERSECTION OF WOODRUFF AVENUE AND FOSTER ROAD
$241,000.00 SEPTEMBER 2016 TO MARCH 2018

Open Location Map
TRAFFIC PROJECTS FIRESTONE BOULEVARD AT WOODRUFF AVENUE TRAFFIC SIGNAL UPGRADE INTERSECTION OF FIRESTONE BOULEVARD AND WOODRUFF AVENUE
PROJECT INCLUDES THE UPGRADE OF THE TRAFFIC SIGNAL AT THE INTERSECTION OF FIRESTONE BOULEVARD AND WOODRUFF AVENUE AND REPLACEMENT OF CURB RAMPS.
$236,000.00 SEPTEMBER 2016 TO MARCH 2018